Mountview Storm & Sanitary Study
Located in the City’s northeast quarter, Mountview has historically faced stormwater flooding and sanitary sewer backups.
Between 2020 and 2023, the City completed nearly $2 million in neighbourhood stormwater infrastructure improvements to reduce surface flooding and basement backflow risk, including:
- 32 new storm structures
- More than half a kilometre of new storm pipe
- Two underground storm chambers
- One outfall structure
In June 2026, the City awarded a contract for the Mountview Storm & Sanitary Modelling project to further investigate localized sanitary sewer backups. The study will:
- Improve understanding of Mountview’s stormwater and sanitary sewer systems
- Identify the root causes of basement sewer backups and surface flood risks
- Collect and incorporate local resident input
- Recommend infrastructure improvements and provide high-level cost estimates to reduce neighbourhood sewer backup risk
Stakeholder engagement will include consultation with local residents and user groups. A resident survey has been developed to gather feedback for the study.
Phases
Phases overview
Phase 1: Historical Construction Phase 1 Summary
Historical Construction Phase 1 Summary
Phase 2: Historical Construction Phase 2 Summary
Historical Construction Phase 2 Summary
Historical Construction Phase 1 Summary
January 1, 2021 6:00 a.m. - December 31, 2021 5:59 a.m.
Phase 1 focused on the intersection of 111 Ave & 97 St and saw the installation of:
- Over 263m of new storm sewers.
- Three manholes.
- Four new catchbasins
- One super catch basin with large volume inlet capacity.
- One storm chamber.