Unfortunately, you can't participate in this project anymore because it has been archived
Bear River Corridor Study
Consultation has concluded. The City of Grande Prairie is updating the Bear River Corridor data and studies, including flood inundation and hazard mapping, slope geohazard assessment, and a top-of-bank setback framework. Monitoring the corridor is a critical step to ensure the city's infrastructure remains protected from flooding and natural changes in the landscape.
Key Dates
- Engagement Open – April 15–28, 2024
- Stakeholder Session – April 24, 2024
- Committee Meeting – July 9, 2024
Important Links
Documents
Who's Listening
Mike Harvard, Development Engineer, City of Grande Prairie — mharvard@cityofgp.com
Phases
Phases overview
Phase 1: Complete
Complete
Complete
April 15, 2024 5:00 a.m. - July 9, 2024 5:00 a.m.
Consultation has concluded. The assessment was presented and accepted for information at the July 9, 2024 Committee meeting.

